In week 8 of 2023, in the EEA Grant 107379/2019 the “Ground heat exchanger, design, execution and installation” works were finished.
In week 8 of 2023, in the EEA Grant 107379/2019 (Hybrid system for energetic efficiency using geothermal energy, applied in UPG) the “Ground heat exchanger, design, execution and installation” works were finished . The contract activities were completed as follows:
Activity 6.11 – Geothermal heat exchanger installation works: heat exchanger location and installation, underground installation, samples and specific tests, including heat exchanger system design (exchanger design and installation);
Activity 6.4 – Heat exchanger equipment and accessory pipes: equipment and accessories necessary for the construction and installation of the heat exchanger and the connection to the heat pump; working agent – antifreeze liquid dilution 20%.
The investment is part of the grant “Hybrid system for energetic efficiency using geothermal energy, applied in UPG”, financed by the EEA and Norwegian Financial Mechanisms 2014-2021 – “Energy Program in Romania”, Call 2 – Increased capacity for the supply of renewable energy – Geothermal energy.