EFICIENTA ENERGETICĂ ÎN CLĂDIRI ȘI ENERGIA GEOTERMALĂ
Studiu de caz campus Universitatea Petrol-Gaze Ploiești (Romania)
In May 29, 2024, at the Petroleum-Gas University of Ploiesti, Ap9 Hall, 15-18 hours, a workshop was held to promote by the Petroleum-Gas University of Ploiesti the project EEA 2019/107379 financed by EEA and Norway Grants and the Prahova County Council. In the project carried out within the Energy Programme in Romania and whose beneficiary…
In May 10, 2024, eng. Dan CÎRJAN – chief-designer and the Project Partner in the Projects EEA 2019/107379 and EEA 2024/388116, attended in the 2nd International Conference on Electrical and Power Engineering ICPE-CA – ASMES 2024, organized in Tulcea (Romania) in the 9-12 May 2024. General topics of the ASMES Conference 2024 are as follows:…
In week 50 of 2022 in the EEA Grant 107379/2019 (Hybrid system for energetic efficiency using geothermal energy, applied in UPG) the procedure for SEAP public tender (SCN1111334/22.07.2022) was finished and the contract with the winner of the tender for the execution “Groundworks and buried installations” was signed. The contract goals are represent by five…
In week 16 of 2024, in the Grant EEA 107379/2019 (Hybrid system for energetic efficiency using geothermal energy, applied in UPG Ploiesti campus) it has been completed the contract for supplying/design/execution/installing of the “Thermic installations (including design, execution and installation of heat pumps and auxiliary equipment)”. The goals of the contract were represented by eight…
In May 29, 2024, at the Petroleum-Gas University of Ploiesti, Ap9 Hall, 9-12 hours, a workshop was held to promote by the Petroleum-Gas University of Ploiesti the project EEA 2019/107379 financed by EEA and Norway Grants and the Prahova County Council. In the project carried out within the Energy Programme in Romania and whose beneficiary…
In week 8 of 2023, in the EEA Grant 107379/2019 (Hybrid system for energetic efficiency using geothermal energy, applied in UPG) the “Ground heat exchanger, design, execution and installation” works were finished . The contract activities were completed as follows: Activity 6.11 – Geothermal heat exchanger installation works: heat exchanger location and installation, underground installation,…