In week 16 of 2024 in the Project EEA 107379/2019 the activities for “Thermic installations (including design, execution and installation of heat pumps and auxiliary equipment)” were completed
In week 16 of 2024, in the Grant EEA 107379/2019 (Hybrid system for energetic efficiency using geothermal energy, applied in UPG Ploiesti campus) it has been completed the contract for supplying/design/execution/installing of the “Thermic installations (including design, execution and installation of heat pumps and auxiliary equipment)”.
The goals of the contract were represented by eight activities as follows:
Cod CPV: 42511110-5 – Activity 3.1 – purchase of heat pumps water-water type,
Cod CPV: 42511110-5 – Activity 3.2 – purchase of heat pumps soil-water and air-water types,
Cod CPV: 42122130-0 – Activity 3.6 – purchase of circulation pumps,
Cod CPV: 42511100-2 – Activity 3.8 – purchase of plates heat exchangers,
Cod CPV: 42533000-1 – Activity 6.3 – purchase of auxiliary equipment for heat pumps and installations,
Cod CPV: 45331100-7 – Activity 6.6 – heat pumps installation works and connection to the system,
Cod CPV: 42511100-2 – Activity 6.8 – purchase of auxiliary equipment and connection works,
Cod CPV: 42161000-5 – Activity 6.9 – buffers and heating distributors.
The investment is part of the grant EEA 107379/2019 “Hybrid system for energetic efficiency using geothermal energy, applied in UPG Ploiesti campus”, financed by the EEA and Norway Grants by Norwegian Financial Mechanisms 2014-2021 – “Energy Program in Romania”, Call 2 – Increased capacity for the supply of renewable energy – Geothermal energy.
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture15.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture14.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture13.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture11.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture10.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture9.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture8.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture7.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture6.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture5.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture4-1.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture3-1.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture2-1.jpg)
![](http://hybridenergy.upg-ploiesti.ro/wp-content/uploads/2024/04/Picture1-1.jpg)