“Drilling works”

Start

In week 14 of 2022 in EEA Grant 107379/2019 (Hybrid system for energetic efficiency using geothermal energy, applied in UPG), the tender winning company for contract Execution

“Drilling works” took over the site and started the works.

The signed contract goals were represent by four activities as follows:

CPV code: 45262220-9 – Activity 3.13 – Vertical drilling and equipment 4×150 m

CPV code: 45262220-9 – Activity 3.13 3.14 – Drilling water wells 2x92m and 2x125m and 3x32m

CPV code: 43134100-2 – Activity 3.1 – Water pumps;

CPV code: 45262220-9 – Activity 5.1 – Well protection works

The investment is part of the grant “Hybrid system for energetic efficiency using geothermal energy, applied in UPG”, financed by the EEA and Norwegian Financial Mechanisms 2014-2021 – “Energy Program in Romania”, Call 2 – Increased capacity for the supply of renewable energy – Geothermal energy.

Finish

The “Drilling works” reception was made in week 29 of 2022 for  the drilling of closed underground wells for heat pumps, injection wells and water collection wells necessary for the water heat pumps to extract energy from the subterranean water. An important part of the project execution was done through this stage named “Drilling works”.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *